Configuration of a Typical MBR System
No
Product
Specification
Unit
Qty
1
MBR modules
PVDF, MBR-20 
pieces
180
2
Designed Flux
1000 Cubic Meter /Day
(20 Hours operation in a day)


3
MBR Frame in SS 304
L x W x H = 2060 x 905 x 2300 mm
Set
6
4
Module in each Frame
Set
30
5
Connectors

Set
6
6
Perforated Aerator
Perforated, DN 100 /125 UPVC Pipe
Set
6
7
Control Panel
Automatic PLC from Siemens
Set
1
8
Air Blower
1 Working + 1 Standby
Set
2
9
Self Priming Pump

Set
1
  • Sludge Pump & Feed Pump: By Client
When even after EFM cleaning the suction pressure is not reducing below 0.03 MPa it will be time for CIP operation.
Take MBR modules out of the pool and insert in the cleaning tank filled with chemicals.
Cleaning tank will have to be filled with a blend of 1000~2000 ppm Sodium Hypochlorite (NaOCl) & 5 % Caustic (NaOH) solution for 4~6 hours.
After adequate period of 4 ~6 hours drain the chemicals.
​Now flush the modules with clean water.  
Now add 1~2% acidic bath (use either Citric or Oxalic or Hydrochloric Acid) and continue for 4 hours. Drain out the acid bath.
​Now flush the MBR modules with clean water again.
MBR Advantages
  • Big specific surface area
  • Easy installation & maintenance
  • Smaller footprint,
  • Higher MLSS retention 
  • Lower investment
  • Lower operation cost
  • High  Flux Anti Fouling 
  • Long Life 
  • ​Good Tensile Strength

Membrane Bio Reactor (MBR)

Technical Specification of MBR
Membrane  Material
PVDF
Outer Diameter (OD)
1.1  mm
Inner Diameter (ID)
0.5 mm
Membrane Pore Size
0.01 µ
MWCO
30 ~ 100,000 Dalton
Filtration Type
Negative Suction
Max. Working Pressure (MPa)
-0.08
Designed Working Pressure (MPa)
-0.01 to -0.03
Maximum Water Temperature
(in C )
45
pH
6~9
MLSS ( mg/L)
3000 ~ 12000
Flux (L/Sq.M/Hour at 25 Degree C)
5 to 25 (Depending on Feed Quality)
Aeration (Cubic M/ Sq.M Membrane Area/Hour)
0.2 ~0.5
Connection Type
UPVC
Seal
Polyurethane / Epoxy Resin
Working Sequence
Filtration 8~10 minutes, Stop 1~2 minutes
and then Backwash for 2~3 minutes
Enhanced Flux Maintenance (EFM)
EFM means cleaning the MBR directly in the pool.
EFM Dosing Chemical
500~1000 mg/L Sodium Hypochlorite Solution
EFM Dosing Capacity
2 L/Sq. M of Surface Area (Membrane Area +
Equivalent Area of Pipes)
EFM with Acid
With 1% Citric Acid
Acidic EFM Frequency
Every 3~6 months
Standard EFM Frequency
Once a week or when suction pressure is
more than -0,03 MPa.
Standard EFM Duration
40~90 minutes depending on situation

MBR Models
MBR Model
Material
Dimensions
L x W x H in mm
Membrane Area
in Sq. M
MBR-10
PVDF
810 x 62 x 1000
10
MBR-10
PVDF
810 x 62 x 1080
10
MBR-20
PVDF
810 x 62 x  1480
20
MBR-20
PVDF
810 x 62 x 1580
20
MBR-30
PVDF
810 x 62 x 1900
30
MBR-30
PVDF
810 x 62 x 2000
30